• Home
  • PROJECTS INFRASTRUCTURE

INFRASTRUTTURE



 Lavori di completamento del Piano Regolatore Portuale – 1° e 2° stralcio funzionale (Porto di Balestrate - Palermo)

Works to complete the Port Regulatory Plan - 1st and 2nd functional section (PORT OF PALERMO - SICILY, ITALY)

  • Ministry of Infrastructures and Transports
  • Works amount: € 16.394.697,98
  • Works start: 13 January 2000
  • Works end: 02 May 2008
  • Works status: Completed
Adduzioni Valdichiana II Lotto II Stralcio completamento

VALDICHIANA SUPPLY SYSTEM - LOT II

  • Irrigation Society of the Italian Region Umbria and Toscana
  • Works amount: € 9.660.000,00
  • Works start: 9 July 2009
  • Works end: 10 Semptember 2010
  • Works status: Completed
Adeguamento nodo termini metro A - Metro B – Roma

ADAPTATION OF THE UNDERGROUND METRO "A" - METRO "B" - ROME JUNCTION

  • Roma Metropolitane S.r.l.
  • Works amount: € 42.460.731,76
  • Works start: 9 April 2010
  • Works end: 28 February 2013
  • Works status: Completed
Aerostazione di Pantelleria

AIRPORT OF PANTELLERIA

  • ENAC Ente Nazionale per l’Aviazione Civile
  • Works amount: € 21.430.372,80
  • Works start: 1 August 2009
  • Works end: 7 May 2013
  • Works status: Completed
Ammodernamento ed adeguamento della linea ferroviaria ex Alifana. Tratto da Secondigliano a Di Vittorio tra la progressiva 2+057 e 3+346

Refurbishment and upgrade of the railway line "Former" Alifan. Secondigliano - Di Vittorio route, between 2+057 and 3+346.

  • Autonomous Authority Volturno - Napoli (Italy)
  • Works amount: € 53.586.762,33
  • Works start: 16 October 2017
  • Works end: in progress
  • Works status: In progress
Ammodernamento ed adeguamento della linea ferroviaria ex Alifana.Tratto da Piscinola a Secondigliano tra la progressiva 0+000 e 2+057

Refurbishment and upgrade of the railway line "Former" Alifan. Piscinola - Secondigliano route, between 0+000 and 2+057

  • Autonomous Authority Volturno - Napoli (Italy)
  • Works amount: € 65.705.630,97
  • Works start: 16 October 2017
  • Works end: In progress
  • Works status: In progress
Ammodernamento linea ferroviaria Circumetnea tratta Paternò Adrano

MODERNIZATION OF THE RAILWAY LINE CIRCUMETNEA IN THE PATERNÒ- ADRANO SECTION - ITALY

  • Railway “Circumetnea Catania General Direction”
  • Works amount: € 191.747.899,53
  • Works start: 22 April 1994
  • Works end: 12 March 2015
  • Works status: Completed
Ampliamento dell'acquedotto di Mwanza - fase 1 - Lotto n.2 – Tanzania

MWANZA WATER SUPPLY PROJECT – REGIONAL CENTRES PROGRAMME PHASE I - TANZANIA

  • Mwanza Urban Water and Sewerage Authority - Tanzania
  • Works amount: € 16.143.525,40
  • Works start: 20 May 2005
  • Works end: 8 September 2009
  • Works status: Completed
Asse Attrezzato città di Catania 1 e 2° stralcio

ASSE ATTREZZATO – CITY OF CATANIA 1ST AND 2ND LOT

  • Municipality of Catania
  • Works amount: € 26.977.485,06
  • Works start: 12 March 2007
  • Works end: 11 November 2008
  • Works status: Completed
Autostrada A/1 Milano - Napoli Attraversamento Appenninico tra sasso Marconi e Barberino del Mugello

MOTORWAY A1 MILAN-NAPLES - ADAPTATION OF THE APENNINE SECTION BETWEEN SASSO MARCONI AND BARBERINO DEL MUGELLO - ITALY

  • Autostrade per L'Italia S.p.A.
  • Works amount: € 263.192.302,93
  • Works start: 07 March 2007
  • Works end: 31 May 2013
  • Works status: Completed
Autostrada A26 “Linzer Autobahn” – Costruzione di un ponte e dei tunnel di collegamento

A26 LINZER AUTOBAHN – CONSTRUCTION OF A BRIDGE AND JUNCTION TUNNEL

  • Asfinag
  • Works amount: € 132.000.000
  • Works start: 19 November 2018
  • Works end: 2023
  • Works status: In progress
Autostrada Messina Palermo - Lotto 29

Highway Messina Palermo - Lot 29

  • Consorzio per le Autostrade Siciliane
  • Works amount: € 26.977.485,06
  • Works start: 29 April 1999
  • Works end: 31 May 2004
  • Works status: Completed
Bretella di Raccordo Balvano e SS407 Basentana

JUNCTION RAMP BALVANO AND NR407 BASENTANA

  • Ministry of Industry, Commerce and Handicrafts - Separate Earthquake Management- Rome
  • Works amount: € 102.238.027,92
  • Works start: 29 April 1983
  • Works end: 12 January 2004
  • Works status: Completed
Collettore di fognatura ampliamento Est

COLLECTOR SEWER EXTENSION EST

  • Metropolitana Milanese S.p.A. - Integrated Water Service
  • Works amount: € 7.194.911,90
  • Works start: 7 April 2006
  • Works end: 1 October 2008
  • Works status: Completed
Costruzione della diga mseilha (libano)

MSEILHA DAM CONSTRUCTION (LEBANON)

  • Republic of Lebanon – Ministry of Energy and Water
  • Works amount: € 57.832.550,50
  • Works start: 01 May 2013
  • Works end: 07/10/2019
  • Works status: Completed

ICM SpA - Copyright © 2018 - All Rights Reserved

Privacy e Policy

ICM SpA - Copyright © 2018 - All Rights Reserved

Privacy and Policy