MSEILHA DAM CONSTRUCTION (LEBANON)

COSTRUZIONE DELLA DIGA MSEILHA (LIBANO)

The works comprise :
a) an embankment dam 400 m long and 35 m high,
b) a temporary diversion tunnel on left bank 255m long and 4m diameter with D cross section transformed at final stage in bottom outlet and assuring the passage of a water supply pipe to a treatment station (not included in this project)
c) a circular spillway shaft 27m high and 10m diameter as well as a tail race tunnel 131 m long and 9m diameter.
d) a three levels water intake structure on left bank.

TECHNICAL SPECIFICATIONS

Employer: Repubblica del Libano - Ministero dell'Energia e dell'Acqua

Works amount: € 55.969.158 ( )

Works start: 01 May 2013

Works end: March 2020

Copyright © 2018. All Rights Reserved Gruppo ICM SPA - 36100 - VICENZA Viale dell'Industria 42 Tel. 0444/336111 Fax 0444/961541 P.IVA - 02526350240 - Privacy e Policy
Powered by Tech&WebSolutions.it

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.

Ok