PURIFICATION PLANT OF AL ABJAR

Impianto di depurazione Al Abjar

The plant was designed for a population of about 47,000 inhabitants with average and peak flow rates of treatment respectively equal to 312.5 m3/h and 937.5 m3/h.The purification system used is activated by active sludges and characterized by a water line, whose treatments result in the purification of the liquid flow rate of wastewater and a sludge line intended for the separation and treatment of the solid part.

TECHNICAL SPECIFICATIONS

Employer: GSPLAJ

Works amount: € 15.539.960,00

Works start: 01 October 2005

Works end: 30 November 2010

ICM SpA - Copyright © 2018 - All Rights Reserved

Privacy e Policy

ICM SpA - Copyright © 2018 - All Rights Reserved

Privacy and Policy