INTERNATIONAL AIRPORT PRAIA (CAPE VERDE)
Expansion and restructuring of the International Airport of Praia – Cape Verde
The main works to be performed are as follows:
- foundations on plinths connected by concrete beams
- Pillars a.c. upper part of the tax and installation of the truss roofing
- Truss roof structure made of metallic carpentry galvanized, and painted
- Coverage faced panels sandwich aluminum
- Construction of a retaining wall made of reinforced concrete, to connect the new and the floor of the terminal HALL
- Construction of two escalators
- Construction of two elevators
- Realization of a luggage conveyor in the same starting area
- Masonry exterior and interior
- Floors and walls in the new HALL
- Floor and wall areas of the old airport
- Aluminum-glass windows
- Development of a new domestic and international baggage claim area
- Realization of new parking areas close to the wall support
- Extension works and functional testing water treatment plant
- Renovation of the customs goods
TECHNICAL SPECIFICATIONS
Employer: Ministero delle Infrastrutture e delle Economie Marittime
Works amount: € 26.950.000
Works start: 21 april 2006
Works end: 31 May 2019