The project is in the Municipality of Palizzi in the town of Reggio Calabria in the Calabria region and concerns the completion of the works previously started for the construction of the 4-lane variant to the SS (state road) 106 in the Palizzi section.
The road length is 3.5 km, and works include the completion of the valley carriageway (2 lanes of 3.75 m, platform on the right of 1.75 m and on the left of 0.50 m for a total paving of 9.75 m2) of the infrastructure originally built, of which the upstream carriageway has recently been completed and opened to traffic.
The following works are part of the project as well: the completion of four tunnels already partially completed and finishing works for the two existing viaducts.