MONTECCHIO MAGGIORE TOLL STATION AND CONNECTING ROADS CONSTRUCTION

Realizzazione delle opere di completamento della nuova autostazione di montecchio maggiore e collegamenti con la viabilità ordinaria

The overall road development is approximately 5800 m, of which 2000 m of motorway and 3800 m of ramps.

The main works consist of:

  • Railway tunnel crossing the highway, single tube, 175 m x 16.4 m wide.
  • Single tube highway underpass, 76 m x 10 m wide.
  • Viaduct with a mixed steel-concrete structure, with a total length of 188 m and a width of 14 m, with four spans 45 m, 35 m, 70 m and 38 m long.
  • Railway Gallery for crossing ramps, consisting of two tubes respectively of 77 m in length and 16 m in width, 86 m in length and 12.5 m in width.
  • Construction of a railway underpass of the Milan-Venice High speed line.

The construction project management as well as the AS BUILT documents will be performed in a BIM environment.

TECHNICAL SPECIFICATIONS

Employer: Autostrada Brescia Verona Vicenza Padova S.p.a.

Works amount: € 56.813.343,42 - Our share: 60%

Works start: July 2019

Works end: ongoing

Copyright © 2018. All Rights Reserved Gruppo ICM SPA - 36100 - VICENZA Viale dell'Industria 42 Tel. 0444/336111 Fax 0444/961541 P.IVA - 02526350240 - Privacy e Policy
Powered by Tech&WebSolutions.it

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.

Ok